ForeTV News
Africa South Africa

Zimbabwe Fires Entire Energy Board

Zimbabwe

Zimbabwe has fired its entire Board of Energy supplier ZESA, accusing it of concentrating on the issues of national power crisis.
Zimbabwe has been going through a crippling power crisis that claimed the former minister of energy Joram Gumbo who was last month reassigned and replaced by Minister Fortune Chasi.
The new Minister said the decision followed a review of the board’s minutes which did not convince him that the board had the capacity to resolve the crisis.
He further said, “Upon reviewing the minutes of the board, I was convinced that it was in the national interest that I take the action I took.”
Zimbabwe had announced last month that it had started to implement load shedding due to low water levels at its Kariba Dam power plant.

The dam, on the border of Zimbabwe and Zambia, is only 34% full and cannot generate electricity at optimal capacity. The country was also facing generation constraints at Hwange Power Station, with limited imports from Eskom in South Africa and from Mozambique.

Eskom is facing  woes of its own, including crippling debt and poorly maintained power stations.

Related posts

[VIDEO]:Nigerian-Investors Lose N195Bn in One Day

TV Station Shuts Down in Zambia

Satire : Kim shoots Trump dead in S. Korea 

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.

WP Twitter Auto Publish Powered By : XYZScripts.com